Wednesday, August 29, 2012

Rockin' It

Schedule Update:  Our house is apparently the slooooooooooooowest one to be built in the community so far so please don't use our timeline as a guide.  A little rain here and there and a permit delay really do impact the crew rotation and schedule.  It's amazing how fast these other two houses have popped up and caught up to us.  We're all going to have final walkthroughs in the same week!

We received our official notice that closing will be on 28 September! ... and we have a sidewalk and a walkway from the soon-to-be driveway to the porch.

Sunday, July 29, 2012

220 Photos Later

Most, if not all, of RH's houses use pre-framed walls which are then assembled on site.  Granted, I would much rather have the walls framed on site for exact measurements but then, one can't have everything one wants.  While I completely understand the positives from utilizing this method, there are, as with any business decision, accompanying negatives.  Lumber will get damaged and is to some degree expected; however, it also depends on the crew and how they choose to repair or replace the defective areas and how keen of an eye your PM has.  My husband and I walked through the house, which despite my griping, looks amazing!  There is a TON of 2x4s in there and I don't expect every one to be perfectly placed and perfectly nailed ... BUT I do notice the ones that aren't.  I don't think our PM has gone through the entire house to inspect it yet (although one wall was marked via spray paint where the studs were completely missed).  We still have a little over a week until the pre-drywall walkthough so I'll give him time to inspect on his own.  That being said, with the trusty camera in hand, I documented our concerns.  Some were minor like poorly nailed areas, ripped barriers, studs with chunks missing, chipped door frame, etc.  Others were a little more serious such as approximately 4 inches of water in the hole for the basement support post, the ~ 1/4 inch of standing water that the stairs are sitting in and soaking up, broken walls, and gaps in the exterior walls and gaps around the windows. 

Sunday, July 22, 2012

Rain, rain, go away!

Between the extreme heat and the downpours, the framing crew has had a fun time this week.  Despite the weather, though, they were mostly done with the exterior walls of the second floor and maybe only a day or so behind.  Needless to say, Mother Nature did not want the trusses up on Friday.  Nor did she want me to have a dry visit on Saturday.  While J and the little one waited in the car, I donned the rain gear and headed into the sopping wet house.  Even with the second floor down, it felt like a steady rain on the interior (just not as bad as outside).

Tuesday, July 17, 2012

Garble, translated

Apparently scuba diving while leaving a message is not recommended...
The only word I really needed in Friday's update was indeed permit.  The county took a little longer to approve the plumbing permit so that put things a little behind schedule.  Framing did begin yesterday (WOOT!) but because of the heat, they left a little early.  The temperature reached the triple digits this afternoon so I suspect they didn't stay too long today.  Our PM is hoping to have the trusses up on Friday and the house wrapped by Monday.  Given the heat, we may slide a few days.  I'll have to drop off a cooler of ice and bottled water the next time we make a lunchtime drive-by.  Despite the potential slip, the house may be completed earlier than anticipated (prior to mid-September).  Once the framing is complete, we'll have a better idea of where we are on the schedule. 

Sunday, July 15, 2012

Garble, garble, garble?

I am soooo making a print and hanging this in the house!

Two posts in one day!

Based on last week's PM update, framing would have started on Wednesday or Thursday.  Because we couldn't get out to site during the week, we were looking forward to this Friday's weekly update and this was waiting for us on the machine:

Garble, garble, garble, garble, permits, garble, garble, garble...