Saturday, September 8, 2012

one hour

What a difference an hour makes!  When we arrived at the house this morning, the bright blue skies and warm summer sun gave promises of a beautiful day.  We, however, knew a major storm front would be rolling through later that afternoon and after one hour exploring the house, the clouds started rolling in.  This was a fantastic opportunity to see the siding and stone in different light.  I happened to get pictures upon arrival and departure, not because I was consciously thinking about the light but because I am a shutterbug and couldn't help myself.  For those of you contemplating Silver Mist siding, Almond trim, Black shutters, and/or Aspen field stone, enjoy the happy accident!

Monday, August 20, 2012

Locked In and already Locked Out!

Wow.  Within one week, the house exploded ... with goodies!  

(disclaimer:  photo-heavy post with commentary in the captions)

This weekend, we interrupted the the trim crew, who did not happen to be Eastern European or driving Audis.  I was able to get some pictures but stepped out to let them cause a minor dust storm sweep.  Little did I know that they would LOCK the doors!  We stopped by the model for the key and I took way too many window measurements and of course, more pictures!  (If you haven't already started researching the cost of blinds, holy cow can one burn instantly through the budget!)

We weren't able to lock in the mortgage rate the week of the pre-drywall meeting last week and missed out on a killer combo (3.25% with 1% help -or- 3.5% with 2.5% help).  Considering when we first started, the rate was at 3.875% and so locking in at 3.5% with 1.5% help is still pretty awesome.  This means cash in hand to finally buy some appliances (more on a future post) and to do some minor work on the current house.  

Sunday, August 12, 2012

Catching Up

Since I didn't post any house pictures from the Pre-Pre-Drywall Walkthrough, I'll mix them in with today's post, including some shots taken from the Pre-Drywall Walkthrough and this weekend's visit.  Everything passed inspection and drywall started this weekend; finishing and painting to occur this week; trim the following week; and final walkthrough is scheduled for 25 September!

Environmental Stoneworks delivery!  I can't wait to see the stone on the house and on the fireplace.  The PM has already marked the height of the stone in the front, including on the garage.  Seeing "Full Stone" spraypainted on the wrap cranked up my heart rate.  (I'm such a girl!)